The Gateway Hotel KM Road
Royal Orchid Central, Shimoga
Amanvana Eight Island Luxury ResortMYSORE: The train network between Mysore and Shimoga will improve following doubling of a 9-km stretch of track between Arasikere and Birur. The stretch between Ballekere and Devanur railway stations is readying for opening with the statutory ...
En route, the train will touch Tumkur (at 06:30 hrs), Arasikere (09:00 hrs), Birur (09:44 hrs), Davanagere (11:42 hrs), Haveri (12:37 hrs), Hubli (14:15 hrs), Gadag (16:45 hrs), Bagalkot (18:50 hrs), Bijapur (21:05 hrs), Hotgi (23:35 hrs), ...
Chikmagalur has scored 88 per cent, NR Pura has scored 83.8 per cent, Mudigere has scored 83.5 per cent, Birur has scored 80 per cent and Tarikere has scored 79 per cent. In Chikmagalur taluk there are 80 schools, of which 18 have bagged 100 per cent ...
The building eviction drive, to facilitate laying of drinking water pipeline to supply water to Kadur and Birur towns from river Bhadra, was restarted on Wednesday in Birur. The drive was led by Town Municipal Council Chief Officer Omkarmurthy.
The South Western Railway will merge Birur-Shimoga Town-Birur Passenger (56239/ 56240) with Bangalore-Shimoga Town-Bangalore Passenger (56227/56228) which will run as a single train from Shimoga Town to Bangalore and back from July 1.
